Customer Pharmacy Benefit Manager (PBM) Change
![Image](https://accumtech.com/wp-content/uploads/2021/06/Case-Study-graphic-02.jpg)
- 140,000+ Members
- Customer elected to change from their existing PBM to another with a one month deadline.
- As a result of AccumTech having standing integrations with both PBMs, data exchange setup commenced immediately and was completed in 3 weeks.
- A notification of the change from the customer is all that is required as a result of the existing integration.
- PBM used native system & formats while medical carrier utilized existing feeds needing only to update minimal, group specific coding.